Renovation Week 7: June 28 - July 2

This week is left to the tile setter to finish up his work with the change room and bathroom tiles. Although these two rooms have a total floor surface of less than 20 square meters, with the walls the tile coverage increases to about 100 square meters.

Bathroom wall tiles
Bathroom wall tiles

Part of the change room wall is made from dry wall or sheetrock, so even with the green type, for a humid environment the tiles are necessary.


Dry wall to be tiled
Change room partition wall has one wall made of dry wall

Change room wall tiles
Change room wall tiles.

Shower stall wall tiles
Shower stall wall tiles

Low bank account balance
Low bank account balance

Next week the painters will return to do some touch-up work, while the electrician will finish installing ground wires, video camera ethernet cable, and finish up with the rest of the work. The pastor will return to finish up minor details such as decorative window framing, installing sanitary products such as sinks, toilets, bidet, shower head, faucets, shower hooks, etc.

See the progress of Week Eight

Italy main phone: +39 340 299 4300 (Call, SMS, Telegram or WhatsApp)

Main judo school: via Gaetano Salvemini 15 / 17, Caserta, Italy (Open to everyone)

Secondary location: U. S. Naval Support Site, Gricignano D'Aversa, Italy (Open only to authorized people)

CSEN Judo Logo USA Judo logo Instagram icon
Instagram
Facebook icon
Facebook
YouTube icon
YouTube

Web design ©2014 Lincoln Han. Judo Link and its logo are trademark properties of Lincoln Han.