Renovation Week 8: July 7 - July 10
The tile setter will finish putting the base board, while the electrician will finish installing ground wires, video camera ethernet cable, and finish up with the rest of the work. The pastor will return to finish up minor details such as decorative window framing, installing sanitary products such as sinks, toilets, bidet, shower head, faucets, shower hooks, etc.
The changes and bathrooms are starting to look final.

These suspended small sinks took a month to arrive but they are stylish and compact in size. Just the right fit.
Every time some work is done, a bunch of trash is generated, but toward the end we have fewer to deal with. Some are going to be recycled and others disposed properly.
More trash, but less overall to haul dispose.
The contract work for the renovation is finished at the end of this week. Next week the sign company will be installing the sign outside and a technician will be installing the air conditioner. We will start with cleaning and touch up on the last details, bringing the mats, etc and start training. Though the internal doors are still missing and we are waiting for them from the factory.